IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1097 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,544 $0 Implemented
UD1097 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $320 Implemented
UD1097 # 03 Y:2025 03 2025 MINIMIZE WATER USAGE $1,616 $0 Implemented
UD1097 # 02 Y:2025 02 2025 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,598 $104 Implemented
UD1097 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $63,287 $0 Implemented
UD1097 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $900 Implemented
UD1097 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $296 $0 Implemented
UD1097 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,220 $14,406 Implemented
UD1072 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,741 $5,000 Implemented
UD1072 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $63 $216 Implemented
UD1072 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,892 $12,650 Implemented
UD1072 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,199 $864 Implemented
UD1069 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,372 $1,389 Implemented
UD1069 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,894 $1,403 Implemented
UD1069 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,461 $952 Implemented
UD1069 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,796 $300 Implemented
UD1069 # 08 Y:2023 08 2023 COVER OPEN TANKS $42 $2,000 Implemented
UD1069 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,978 $0 Implemented
WV0653 # 06 Y:2023 06 2023 MINIMIZE WATER USAGE $13,630 $45,516 Implemented
WV0653 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,961 $800 Implemented
WV0653 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,884 $14,800 Implemented
WV0653 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $33,555 $52,800 Implemented
WV0653 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $38,158 $64,250 Implemented
WV0653 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,758 $2,675 Implemented
WV0653 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $1,621 $787 Implemented