IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,343

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0132 # 07 Y:2014 07 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,145 $7,000 Not Implemented
TT0132 # 08 Y:2014 08 2014 INSTALL COMMON HEADER ON COMPRESSORS $3,556 $12,000 Not Implemented
TT0132 # 09 Y:2014 09 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $37,546 $80,000 Not Implemented
TT0132 # 10 Y:2014 10 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $50 Not Implemented
TT0132 # 11 Y:2014 11 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,407 $8,750 Implemented
TT0132 # 12 Y:2014 12 2014 REDUCE FLUID FLOW RATES $893 $1,000 Not Implemented
TT0132 # 13 Y:2014 13 2014 DISCONNECT BALLASTS $1,153 $63 Not Implemented
TT0132 # 14 Y:2014 14 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $892 $850 Not Implemented
BD0442 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,957 $8,000 Not Implemented
BD0442 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,866 $17,640 Not Implemented
BD0442 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $724 $600 Not Implemented
UD0896 # 01 Y:2014 01 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $0 Implemented
UD0896 # 02 Y:2014 02 2014 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $31,308 $10,500 Not Implemented
UD0896 # 03 Y:2014 03 2014 MINIMIZE WATER USAGE $7,067 $8,000 Not Implemented
UD0896 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $683 $500 Not Implemented
UD0896 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22 $0 Not Implemented
UD0896 # 06 Y:2014 06 2014 OPTIMIZE PLANT POWER FACTOR $9,728 $8,000 Not Implemented
UD0896 # 07 Y:2014 07 2014 USE OPTIMUM THICKNESS INSULATION $1,035 $1,211 Not Implemented
UD0896 # 08 Y:2014 08 2014 USE RADIANT HEATER FOR SPOT HEATING $794 $1,000 Not Implemented
UA0112 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,737 $19,304 Not Implemented
UA0112 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,385 $2,330 Implemented
UA0112 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,177 $878 Implemented
UA0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,965 $49,792 Not Implemented
UA0112 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,143 $520 Not Implemented
WV0477 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $3,015 $2,013 Implemented