IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,343

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0477 # 02 Y:2013 02 2013 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,823 $6,345 Not Implemented
WV0477 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,064 $3,573 Not Implemented
WV0477 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,996 $1,000 Not Implemented
WV0477 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $1,581 Not Implemented
WV0477 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $595 $257 Implemented
WV0477 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $490 $1,035 Implemented
WV0477 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $366 $135 Implemented
WV0477 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $260 $137 Implemented
WV0477 # 10 Y:2013 10 2013 INSTALL TIMERS AND/OR THERMOSTATS $257 $586 Not Implemented
UK1316 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,600 $0 Implemented
UK1316 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,113 $0 Not Implemented
UK1316 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $9,386 $1,600 Implemented
UK1316 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,885 $3,060 Not Implemented
UK1316 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $1,930 Not Implemented
UK1316 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $2,534 $3,475 Implemented
UK1316 # 07 Y:2013 07 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,429 $0 Not Implemented
UK1316 # 08 Y:2013 08 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $716 $840 Implemented
UK1316 # 09 Y:2013 09 2013 REDUCE FLUID FLOW RATES $465 $0 Not Implemented
UK1316 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $365 $840 Not Implemented
TT0115 # 01 Y:2013 01 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,000 $50,000 Implemented
TT0115 # 02 Y:2013 02 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,000 $50,000 Implemented
TT0115 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,000 $50,000 Not Implemented
TT0115 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $32,990 $129,250 Not Implemented
TT0115 # 05 Y:2013 05 2013 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $146,360 $450,000 Not Implemented
TT0115 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,000 $4,000 Not Implemented