IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,277

matching recommendations
Reset
NAICS 3262 Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0162 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,380 $2,300 Not Implemented
WM0162 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,298 $4,575 Not Implemented
GT0950 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,607 $225 Implemented
GT0950 # 02 Y:2020 02 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,114 $400 Not Implemented
GT0950 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,557 $4,500 Implemented
GT0950 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,586 $47,656 Implemented
GT0950 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $337 $401 Implemented
GT0950 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $1,358 $5,106 Not Implemented
GT0950 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $97,184 $1,413,929 Not Implemented
GT0950 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,956 $38,500 Implemented
NL0048 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71,559 $111,731 Implemented
NL0048 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $24,509 $66,100 Not Implemented
NL0048 # 03 Y:2020 03 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $22,004 $20,500 Not Implemented
NL0048 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,955 $4,000 Implemented
NL0048 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,824 $50 Implemented
NL0048 # 06 Y:2020 06 2020 RECOVER AND REUSE WASTE MATERIAL $664 $3,180 Not Implemented
UD1013 # 01 Y:2020 01 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,208 $0 Implemented
UD1013 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $75,593 $7,810 Not Implemented
UD1013 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $9,464 $1,012 Not Implemented
UD1013 # 04 Y:2020 04 2020 INSULATE BARE EQUIPMENT $768 $203 Not Implemented
UD1013 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,951 $5,000 Implemented
UD1013 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,346 $1,000 Implemented
UD1013 # 07 Y:2020 07 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $792 $600 Not Implemented
UD1013 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,239 $14,500 Implemented
UD1013 # 09 Y:2020 09 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,053 $1,800 Not Implemented