Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
38
matching recommendationsNAICS | 3262 | Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0078 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $658 | $80 | Implemented |
NL0078 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $6,550 | $20,000 | Not Implemented |
NL0078 # 01 Y:2023 | 01 | 2023 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $31,345 | $100,000 | Implemented |
NL0078 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $270 | $415 | Implemented |
NL0078 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $812 | $2,080 | Implemented |
NL0078 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,587 | $2,300 | Implemented |
NL0078 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,358 | $17,280 | Implemented |
NL0078 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $128 | $250 | Implemented |
NL0048 # 02 Y:2020 | 02 | 2020 | OPTIMIZE PLANT POWER FACTOR | $24,509 | $66,100 | Not Implemented |
NL0048 # 06 Y:2020 | 06 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $664 | $3,180 | Not Implemented |
NL0048 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $71,559 | $111,731 | Implemented |
NL0048 # 03 Y:2020 | 03 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $22,004 | $20,500 | Not Implemented |
NL0048 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,955 | $4,000 | Implemented |
NL0048 # 05 Y:2020 | 05 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,824 | $50 | Implemented |
NL0028 # 01 Y:2019 | 01 | 2019 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $23,879 | $45,000 | Not Implemented |
NL0028 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,950 | $52,450 | Implemented |
NL0028 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $3,028 | $4,631 | Implemented |
NL0028 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,582 | $1,600 | Implemented |
NL0028 # 05 Y:2019 | 05 | 2019 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $132 | $474 | Not Implemented |
IA0452 # 01 Y:2010 | 01 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $509 | $20 | Implemented |
IA0452 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $285 | Implemented |
IA0452 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,308 | $98 | Implemented |
IA0452 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,118 | $824 | Not Implemented |
IA0452 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,217 | $60 | Implemented |
IA0452 # 07 Y:2010 | 07 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,294 | $8,619 | Implemented |