IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

154

matching recommendations
Reset
NAICS 326211 Tire Manufacturing (except Retreading)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0940 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,586 $7,700 Not Implemented
OK0940 # 06 Y:2016 06 2016 INSTALL SET-BACK TIMERS $1,433 $1,280 Implemented
OK0940 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $2,782 Implemented
OK0940 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,268 $4,752 Not Implemented
OK0940 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,811 $17,000 Not Implemented
OK0940 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,509 $14,500 Not Implemented
OK0940 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $5,900 $38,500 Not Implemented
MZ0189 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,835 $5,500 Not Implemented
MZ0189 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,865 $880 Implemented
MZ0189 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,216 $2,500 Implemented
MZ0189 # 02 Y:2015 02 2015 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $4,178 $8,000 Not Implemented
MZ0189 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,139 $0 Implemented
MZ0189 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,361 $0 Not Implemented
MZ0195 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,672 $860 Implemented
MZ0195 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $349 $500 Implemented
MZ0195 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $887 $2,000 Not Implemented
MZ0195 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,017 $10,320 Implemented
MZ0195 # 03 Y:2015 03 2015 USE PHOTOCELL CONTROLS $4,839 $980 Not Implemented
MZ0190 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,028 $1,500 Not Implemented
MZ0190 # 02 Y:2015 02 2015 CONDENSE OPERATION INTO ONE BUILDING $12,608 $0 Not Implemented
MZ0190 # 03 Y:2015 03 2015 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $20,868 $40,000 Not Implemented
MZ0190 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,095 $3,500 Not Implemented
MZ0190 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,663 $1,500 Not Implemented
MZ0190 # 06 Y:2015 06 2015 ELIMINATE/REDUCE AN OPERATION $928 $0 Not Implemented
MZ0190 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,483 $860 Implemented