IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

264

matching recommendations
Reset
NAICS 32622 Rubber and Plastics Hoses and Belting Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0219 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,272 $172 Not Implemented
UU0219 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,112 $13,345 Implemented
UU0219 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $242,311 $1,768,555 Not Implemented
UU0219 # 06 Y:2023 06 2023 INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE $1,035 $729 Not Implemented
UU0219 # 04 Y:2023 04 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,850 $18,236 Not Implemented
UU0219 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,350 $2,350 Not Implemented
OK1077 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,559 $9,108 Not Implemented
OK1077 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $347 Implemented
OK1077 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,586 $7,371 Not Implemented
OK1077 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,255 $7,590 Not Implemented
OK1077 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $24,215 $230,880 Not Implemented
GT0950 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $1,358 $5,106 Not Implemented
GT0950 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $97,184 $1,413,929 Not Implemented
GT0950 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $337 $401 Implemented
GT0950 # 08 Y:2020 08 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,956 $38,500 Implemented
GT0950 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,586 $47,656 Implemented
GT0950 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,557 $4,500 Implemented
GT0950 # 02 Y:2020 02 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,114 $400 Not Implemented
GT0950 # 01 Y:2020 01 2020 INSTALL TIMERS AND/OR THERMOSTATS $1,607 $225 Implemented
NL0048 # 03 Y:2020 03 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $22,004 $20,500 Not Implemented
NL0048 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $24,509 $66,100 Not Implemented
NL0048 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $71,559 $111,731 Implemented
NL0048 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,824 $50 Implemented
NL0048 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,955 $4,000 Implemented
NL0048 # 06 Y:2020 06 2020 RECOVER AND REUSE WASTE MATERIAL $664 $3,180 Not Implemented