Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
269
matching recommendationsNAICS | 32622 | Rubber and Plastics Hoses and Belting Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0027 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,335 | $0 | n/a |
NT0027 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,456 | $5,609 | n/a |
NT0027 # 05 Y:2024 | 05 | 2024 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,408 | $3,040 | n/a |
NT0027 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,267 | $5,347 | n/a |
NT0027 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $2,533 | $1,946 | n/a |
UU0219 # 04 Y:2023 | 04 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,850 | $18,236 | Not Implemented |
UU0219 # 06 Y:2023 | 06 | 2023 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $1,035 | $729 | Not Implemented |
UU0219 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,272 | $172 | Not Implemented |
UU0219 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $242,311 | $1,768,555 | Not Implemented |
UU0219 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,350 | $2,350 | Not Implemented |
UU0219 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,112 | $13,345 | Implemented |
OK1077 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,586 | $7,371 | Not Implemented |
OK1077 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,559 | $9,108 | Not Implemented |
OK1077 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,255 | $7,590 | Not Implemented |
OK1077 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $530 | $347 | Implemented |
OK1077 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,215 | $230,880 | Not Implemented |
GT0950 # 08 Y:2020 | 08 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,956 | $38,500 | Implemented |
GT0950 # 01 Y:2020 | 01 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $1,607 | $225 | Implemented |
GT0950 # 02 Y:2020 | 02 | 2020 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,114 | $400 | Not Implemented |
GT0950 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,557 | $4,500 | Implemented |
GT0950 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,586 | $47,656 | Implemented |
GT0950 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $337 | $401 | Implemented |
GT0950 # 06 Y:2020 | 06 | 2020 | OPTIMIZE PLANT POWER FACTOR | $1,358 | $5,106 | Not Implemented |
GT0950 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $97,184 | $1,413,929 | Not Implemented |
NL0048 # 06 Y:2020 | 06 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $664 | $3,180 | Not Implemented |