IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
NAICS 32629 Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0006 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,078 $7,298 Not Implemented
SJ0006 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,467 $665,395 Not Implemented
SJ0006 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,713 $4,600 Not Implemented
SJ0006 # 08 Y:2023 08 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $332 $1,762 Not Implemented
SJ0006 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,647 $23,000 Not Implemented
SJ0006 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $798 $2,977 Not Implemented
SJ0006 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,014 $7,324 Not Implemented
SJ0006 # 07 Y:2023 07 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,791 $39,456 Not Implemented
SD0575 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $718 $0 Implemented
SD0575 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,276 $7,083 Not Implemented
SD0575 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,476 $4,242 Not Implemented
SD0575 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,233 $600 Implemented
SD0575 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $441 $540 Not Implemented
SD0575 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $142 $218 Not Implemented
SD0456 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,322 $7,503 Implemented
SD0456 # 05 Y:2012 05 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,297 $500 Implemented
SD0456 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $5,372 $4,900 Not Implemented
SD0456 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,827 $200 Implemented
SD0456 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,264 $10,398 Implemented
SD0456 # 02 Y:2012 02 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,534 $2,700 Implemented
SD0456 # 01 Y:2012 01 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $48,105 $79,350 Not Implemented
SD0456 # 10 Y:2012 10 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,050 $200 Implemented
SD0456 # 09 Y:2012 09 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $2,556 $7,320 Not Implemented
SD0456 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,790 $600 Implemented
SD0447 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,656 $38,885 Not Implemented