Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsNAICS | 32629 | Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0100 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $323 | $87 | Implemented |
IP0100 # 06 Y:2018 | 06 | 2018 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,530 | $11,407 | Not Implemented |
IP0100 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,641 | $800 | Implemented |
IP0100 # 04 Y:2018 | 04 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,491 | $1,482 | Implemented |
IP0100 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $831 | $0 | Not Implemented |
IP0100 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,439 | $2 | Implemented |
IP0100 # 08 Y:2018 | 08 | 2018 | OPTIMIZE PLANT POWER FACTOR | $59,133 | $75,790 | Implemented |
UD0853 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $974 | $2,000 | Not Implemented |
UD0853 # 08 Y:2012 | 08 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,506 | $1,000 | Not Implemented |
UD0853 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,012 | $1,000 | Not Implemented |
UD0853 # 06 Y:2012 | 06 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,059 | $7,000 | Not Implemented |
UD0853 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $6,272 | $6,000 | Not Implemented |
UD0853 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,192 | $5,500 | Not Implemented |
UD0853 # 03 Y:2012 | 03 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $15,738 | $600 | Not Implemented |
UD0853 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,997 | $3,815 | Not Implemented |
UD0853 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $28,511 | Not Implemented |
UD0853 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $402 | $1,300 | Not Implemented |
UD0853 # 11 Y:2012 | 11 | 2012 | COVER OPEN TANKS | $4,120 | $200 | Not Implemented |
UD0853 # 12 Y:2012 | 12 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,076 | $9,000 | Not Implemented |
UD0751 # 08 Y:2006 | 08 | 2006 | HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS | $8,395 | $2,000 | Not Implemented |
UD0751 # 07 Y:2006 | 07 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,000 | $0 | Not Implemented |
UD0751 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,066 | $28,800 | Not Implemented |
UD0751 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $21,149 | $61,500 | Not Implemented |
UD0751 # 03 Y:2006 | 03 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,112 | $0 | Not Implemented |
UD0751 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $63,687 | $0 | Implemented |