Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
97
matching recommendationsNAICS | 32629 | Other Rubber Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0669 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,220 | $1,016 | n/a |
SD0669 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,779 | $0 | n/a |
SD0669 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $298,549 | $273,844 | n/a |
SD0669 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $20,905 | $894 | n/a |
SD0669 # 07 Y:2025 | 07 | 2025 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $19,984 | $1,400 | n/a |
SD0669 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,398 | $3,518 | n/a |
SD0669 # 08 Y:2025 | 08 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $21,106 | $91,450 | n/a |
SD0669 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,099 | $2,437 | n/a |
SJ0006 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,647 | $23,000 | Not Implemented |
SJ0006 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,078 | $7,298 | Not Implemented |
SJ0006 # 08 Y:2023 | 08 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $332 | $1,762 | Not Implemented |
SJ0006 # 07 Y:2023 | 07 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,791 | $39,456 | Not Implemented |
SJ0006 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,713 | $4,600 | Not Implemented |
SJ0006 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $798 | $2,977 | Not Implemented |
SJ0006 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,014 | $7,324 | Not Implemented |
SJ0006 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $132,467 | $665,395 | Not Implemented |
SD0575 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,476 | $4,242 | Not Implemented |
SD0575 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,233 | $600 | Implemented |
SD0575 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,276 | $7,083 | Not Implemented |
SD0575 # 05 Y:2019 | 05 | 2019 | INSTALL OCCUPANCY SENSORS | $441 | $540 | Not Implemented |
SD0575 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $142 | $218 | Not Implemented |
SD0575 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $718 | $0 | Implemented |
SD0456 # 01 Y:2012 | 01 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $48,105 | $79,350 | Not Implemented |
SD0456 # 04 Y:2012 | 04 | 2012 | USE PHOTOCELL CONTROLS | $5,372 | $4,900 | Not Implemented |
SD0456 # 05 Y:2012 | 05 | 2012 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,297 | $500 | Implemented |