IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 326291 Rubber Product Manufacturing for Mechanical Use
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0862 # 06 Y:2023 06 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $1,203 $4,750 Implemented
AM0862 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,080 $16,563 Implemented
AM0862 # 03 Y:2023 03 2023 REPAIR AND ELIMINATE STEAM LEAKS $18,325 $6,300 Implemented
AM0862 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $27,516 $41,926 Implemented
AM0862 # 01 Y:2023 01 2023 REPAIR OR REPLACE STEAM TRAPS $80,175 $8,170 Implemented
AM0853 # 10 Y:2022 10 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $300 Implemented
AM0853 # 09 Y:2022 09 2022 USE SYNTHETIC LUBRICANT $830 $500 Implemented
AM0853 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,850 $5,000 Implemented
AM0853 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,530 $13,140 Implemented
AM0853 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,715 $500 Implemented
AM0853 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $2,070 $275 Implemented
AM0853 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,170 $345 Implemented
AM0746 # 02 Y:2018 02 2018 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $13,690 $4,570 Implemented
AM0746 # 10 Y:2018 10 2018 USE PHOTOCELL CONTROLS $1,230 $625 Implemented
AM0746 # 09 Y:2018 09 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,795 $500 Implemented
AM0746 # 08 Y:2018 08 2018 USE SYNTHETIC LUBRICANT $1,780 $0 Implemented
AM0746 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $2,200 $890 Implemented
AM0746 # 06 Y:2018 06 2018 PAY UTILITY BILLS ON TIME $2,256 $0 Implemented
AM0746 # 03 Y:2018 03 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,310 $1,350 Implemented
AM0746 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,600 $13,500 Implemented
TA0118 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,339 $2,016 Implemented
TA0118 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,842 $2,000 Implemented
TA0118 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,049 $90 Implemented
TA0118 # 05 Y:2006 05 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $520 $0 Implemented
TA0118 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $350 $0 Implemented