IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
NAICS 326299 All Other Rubber Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 Implemented
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 Implemented
UF0602 # 08 Y:2023 08 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,084 $4,788 Implemented
UF0602 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26,608 $0 Implemented
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 Implemented
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 Implemented
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 Implemented
UF0597 # 05 Y:2023 05 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,959 $11,134 Implemented
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
UF0597 # 08 Y:2023 08 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $51,744 $18,218 Implemented
UF0597 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,699 $4,994 Implemented
UF0597 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $13,706 Implemented
UF0597 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,142 $22,000 Implemented
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0597 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,876 $14,705 Implemented
MI0205 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,114 $2,500 Implemented
MI0158 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $92,023 $8,580 Implemented
MI0158 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,886 $2,000 Implemented
MI0158 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,073 $40 Implemented
MI0158 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $13,330 $1,700 Implemented
MI0158 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,507 $1,210 Implemented
MI0158 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,963 $20,900 Implemented
MI0158 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,437 $101,347 Implemented