Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1096 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $394,679 $75,000 Implemented
OK1096 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,865 $10,337 Implemented
OK1096 # 08 Y:2023 08 2023 MAINTAIN MACHINES TO REDUCE LEAKS $2,796 $500 Implemented
OK1096 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $1,354 Implemented
OK1096 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,791 $464,597 Implemented
AM0794 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $990 $450 Implemented
AM0794 # 07 Y:2020 07 2020 PAY UTILITY BILLS ON TIME $127 $0 Implemented
AM0794 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,215 $2,000 Implemented
AM0794 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,250 $2,000 Implemented
AM0794 # 03 Y:2020 03 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,100 $8 Implemented
AM0794 # 05 Y:2020 05 2020 USE SYNTHETIC LUBRICANT $801 $100 Implemented
AM0765 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $71,530 $81,610 Implemented
AM0765 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,060 $1,000 Implemented
AM0765 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $510 $595 Implemented
AM0765 # 05 Y:2018 05 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,740 $0 Implemented
AM0754 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,555 $3,232 Implemented
AM0754 # 07 Y:2018 07 2018 USE SYNTHETIC LUBRICANT $312 $0 Implemented
AM0754 # 01 Y:2018 01 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $63,539 $195,000 Implemented
AM0754 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $7,740 $11,520 Implemented
AM0754 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,670 $1,000 Implemented
AM0754 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $9 Implemented
TR0007 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,558 $3,000 Implemented
TR0007 # 05 Y:2018 05 2018 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $5,572 $500 Implemented
TR0007 # 03 Y:2018 03 2018 RECYCLE FLUORESCENT LAMPS $10,606 $23,530 Implemented
TR0007 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $5,927 $22,500 Implemented