IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0931 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,502 $151,300 Implemented
UD0931 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,304 $0 Implemented
UD0931 # 04 Y:2015 04 2015 DEVELOP A REPAIR/REPLACE POLICY $1,102 $3,250 Not Implemented
UD0931 # 03 Y:2015 03 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $171,582 $16,050 Not Implemented
UD0931 # 02 Y:2015 02 2015 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $185,788 $193 Not Implemented
UD0931 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $108,029 $0 Not Implemented
UD0925 # 09 Y:2015 09 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,400 $0 Not Implemented
UD0925 # 08 Y:2015 08 2015 INSTALL SENSORS TO DETECT AND AVOID JAMS $7,714 $120,000 Implemented
UD0925 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,405 $66,200 Not Implemented
UD0925 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,964 $1,000 Implemented
UD0925 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,759 $5,000 Not Implemented
UD0925 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $4,804 $34,000 Not Implemented
UD0925 # 03 Y:2015 03 2015 USE OPTIMUM TEMPERATURE $46,665 $0 Not Implemented
UD0925 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $221,454 $15,345 Not Implemented
UD0925 # 01 Y:2015 01 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $860 $0 Implemented
UD0923 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,021 $400 Not Implemented
UD0923 # 09 Y:2015 09 2015 COMBINE UTILITY METERS $105,406 $156,400 Not Implemented
UD0923 # 10 Y:2015 10 2015 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $343 $0 Implemented
UD0923 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,241 $50 Implemented
UD0923 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $243 $400 Not Implemented
UD0923 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $28,993 $2,000 Not Implemented
UD0923 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,909 $10,000 Not Implemented
UD0923 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,734 $0 Implemented
UD0923 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $4,777 $600 Not Implemented
UD0923 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $5,978 $19,581 Implemented