IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,633

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0618 # 05 Y:2007 05 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,589 $17,740 Implemented
MA0618 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $7,795 $1,924 Implemented
MA0618 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $4,906 $18,500 Implemented
MA0618 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,125 $3,552 Implemented
MA0618 # 09 Y:2007 09 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,070 $340 Implemented
IA0406 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,718 $500 Implemented
IA0406 # 02 Y:2007 02 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $896 $100 Implemented
IA0406 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $364 $25 Implemented
IA0406 # 04 Y:2007 04 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $7,396 $1,000 Not Implemented
IA0406 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $386 $55 Not Implemented
IA0406 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $507 $100 Implemented
IA0406 # 07 Y:2007 07 2007 USE RADIANT HEATER FOR SPOT HEATING $21,600 $10,000 Implemented
LL0272 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $102,410 $49,360 Not Implemented
LL0272 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $58,782 $19,636 Implemented
LL0272 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,485 $7,000 Not Implemented
LL0272 # 04 Y:2007 04 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $7,489 $422 Not Implemented
LL0272 # 05 Y:2007 05 2007 INSTALL SKYLIGHTS $2,828 $5,040 Not Implemented
LL0272 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,024 $1,499 Not Implemented
LL0272 # 07 Y:2007 07 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $832 $830 Not Implemented
LL0272 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,020 $2,338 Not Implemented
LL0272 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $1,169 Not Implemented
LL0272 # 10 Y:2007 10 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $517 $5,436 Not Implemented
SU0254 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,902 $0 Implemented
SU0254 # 02 Y:2007 02 2007 USE SYNTHETIC LUBRICANT $3,743 $0 Implemented
SU0254 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,618 $0 Implemented