IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,623

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0306 # 01 Y:2004 01 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,489 $20,910 Not Implemented
WV0306 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $17,374 $5,922 Implemented
WV0306 # 03 Y:2004 03 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,768 $660 Not Implemented
WV0306 # 04 Y:2004 04 2004 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,517 $370 Not Implemented
WV0306 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,967 $2,040 Implemented
WV0306 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,591 $420 Not Implemented
WV0306 # 07 Y:2004 07 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,120 $520 Not Implemented
WV0306 # 08 Y:2004 08 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $985 $160 Implemented
WV0306 # 09 Y:2004 09 2004 DEVELOP A REPAIR/REPLACE POLICY $934 $160 Implemented
WV0306 # 10 Y:2004 10 2004 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $796 $40 Implemented
WV0306 # 11 Y:2004 11 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $777 $1,060 Not Implemented
WV0306 # 12 Y:2004 12 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $3,480 Implemented
WV0306 # 13 Y:2004 13 2004 INSTALL OCCUPANCY SENSORS $395 $800 Implemented
WV0306 # 14 Y:2004 14 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $318 $105 Not Implemented
BD0269 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,588 $225 Implemented
BD0269 # 02 Y:2004 02 2004 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,568 $3,200 Implemented
BD0269 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,822 $1,400 Implemented
BD0269 # 04 Y:2004 04 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,160 $5,500 Implemented
BD0269 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,779 $42 Not Implemented
BD0269 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,736 $0 Implemented
BD0269 # 07 Y:2004 07 2004 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $1,363 $340 Implemented
BD0269 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,601 $731 Implemented
BD0269 # 09 Y:2004 09 2004 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,243 $2,000 Implemented
BD0269 # 10 Y:2004 10 2004 INSTALL OCCUPANCY SENSORS $1,157 $1,200 Not Implemented
BD0269 # 11 Y:2004 11 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $680 $500 Implemented