Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0571 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $22,882 | $38 | n/a |
AS0571 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $61,102 | $20,000 | n/a |
AS0571 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,525 | $34,427 | n/a |
AS0571 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $430 | $987 | n/a |
AS0571 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,292 | $908 | n/a |
AS0571 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,526 | $55,952 | n/a |
AS0571 # 06 Y:2024 | 06 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $492 | $511 | n/a |
AS0556 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $4,658 | $7,034 | Not Implemented |
AS0556 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,073 | $10,283 | Not Implemented |
AS0556 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,360 | $14,735 | Not Implemented |
AS0555 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $871 | $21 | Not Implemented |
AS0555 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,078 | $399 | Not Implemented |
AS0555 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,534 | $2,105 | Not Implemented |
AS0555 # 04 Y:2023 | 04 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,107 | $1,243 | Not Implemented |
AS0555 # 03 Y:2023 | 03 | 2023 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $3,260 | $2,932 | Not Implemented |
AS0555 # 02 Y:2023 | 02 | 2023 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $10,191 | $10,364 | Not Implemented |
AS0555 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,191 | $11,546 | Not Implemented |
AS0556 # 02 Y:2023 | 02 | 2023 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $35,924 | $12,039 | Not Implemented |
AS0556 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $703 | $532 | Not Implemented |
AS0556 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,579 | $2,858 | Not Implemented |
AS0535 # 04 Y:2022 | 04 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $539 | $156 | Implemented |
AS0535 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,081 | $17,428 | Not Implemented |
AS0535 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,698 | $7,427 | Not Implemented |
AS0535 # 01 Y:2022 | 01 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,534 | $44,427 | Implemented |
AS0478 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,567 | $2,918 | Implemented |