IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2411 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,308 $50,000 n/a
UL2411 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,717 $1,995 n/a
UL2411 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $746 $2,700 n/a
UL2411 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $76,606 $698,579 n/a
UL2411 # 05 Y:2024 05 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,372 $5,000 n/a
UL2411 # 04 Y:2024 04 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,053 $13,653 n/a
UK1604 # 06 Y:2016 06 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,304 $3,620 Implemented
UK1604 # 10 Y:2016 10 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,729 $6,000 Not Implemented
UK1604 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,645 $1,200 Not Implemented
UK1604 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $56 $61 Implemented
UK1604 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,018 $3,500 Implemented
UK1604 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $153 $280 Implemented
UK1604 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $166 $196 Not Implemented
UK1604 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,425 $67,500 Not Implemented
UK1604 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $14,750 $8,715 Implemented
UK1604 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,094 $5,000 Implemented
UK1512 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,248 $7,985 Not Implemented
UK1512 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $475 Not Implemented
UK1512 # 10 Y:2015 10 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,609 $1,500 Implemented
UK1512 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $4,297 $12,750 Not Implemented
UK1512 # 09 Y:2015 09 2015 INSULATE FEEDWATER TANK $1,278 $994 Implemented
UK1512 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,559 $0 Implemented
UK1512 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,043 $1,215 Not Implemented
UK1512 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $4,650 Not Implemented
UK1512 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,209 $3,940 Implemented