Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0774 # 04 Y:2023 | 04 | 2023 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,255 | $1,480 | Not Implemented |
OR0774 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $10,951 | $10,710 | Not Implemented |
OR0774 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,206 | $88,913 | Not Implemented |
OR0774 # 02 Y:2023 | 02 | 2023 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $22,803 | $17,436 | Not Implemented |
OR0649 # 10 Y:2015 | 10 | 2015 | INSTALL OCCUPANCY SENSORS | $1,371 | $2,065 | Not Implemented |
OR0649 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,638 | $1,819 | Implemented |
OR0649 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,277 | $2,139 | Implemented |
OR0649 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $572 | $1,000 | Not Implemented |
OR0649 # 06 Y:2015 | 06 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,387 | $10,298 | Not Implemented |
OR0649 # 05 Y:2015 | 05 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,536 | $438 | Not Implemented |
OR0649 # 04 Y:2015 | 04 | 2015 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $5,913 | $4,455 | Not Implemented |
OR0649 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,825 | $0 | Not Implemented |
OR0649 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,484 | $2,065 | Implemented |
OR0649 # 01 Y:2015 | 01 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $18,604 | $16,250 | Not Implemented |
OR0649 # 11 Y:2015 | 11 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,941 | $19,500 | Implemented |
OR0504 # 06 Y:2006 | 06 | 2006 | REDESIGN PROCESS | $6,100 | $5,000 | Not Implemented |
OR0504 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,500 | $1,000 | Not Implemented |
OR0504 # 05 Y:2006 | 05 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $23,000 | $0 | Implemented |
OR0504 # 04 Y:2006 | 04 | 2006 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $28,000 | $0 | Not Implemented |
OR0504 # 03 Y:2006 | 03 | 2006 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $84,100 | $0 | Not Implemented |
OR0504 # 02 Y:2006 | 02 | 2006 | REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS | $22,500 | $44,500 | Implemented |
OR0504 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $64,300 | $20,000 | Implemented |
OR0482 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,526 | $0 | Implemented |
OR0482 # 03 Y:2005 | 03 | 2005 | COMBINE UTILITY METERS | $1,500 | $4,000 | Not Implemented |
OR0482 # 02 Y:2005 | 02 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $60,800 | $101,000 | Not Implemented |