IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0510 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,017 $17,100 Implemented
LE0510 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,926 $45,000 Implemented
LE0510 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,951 $30,000 Implemented
LE0510 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,170 $21,000 Implemented
LE0510 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,899 $12,800 Implemented
LE0510 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,653 $100,000 Implemented
LE0510 # 08 Y:2021 08 2021 REPLACE BOILER $334,294 $1,800,000 Implemented
LE0435 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,469 $1,000 Implemented
LE0435 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $20 Implemented
LE0435 # 05 Y:2017 05 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,092 $23,000 Implemented
LE0307 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,286 $800 Implemented
LE0307 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $15,010 $125 Implemented
LE0293 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,105 $2,932 Implemented
LE0293 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,797 $1,800 Implemented
LE0293 # 01 Y:2009 01 2009 USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED $25,144 $15,000 Implemented
LE0293 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $2,864 $700 Implemented
LE0293 # 05 Y:2009 05 2009 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,697 $27,600 Implemented
LE0293 # 06 Y:2009 06 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $717 $1,675 Implemented
LE0293 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,196 $58,455 Implemented
SU0182 # 04 Y:2004 04 2004 USE SYNTHETIC LUBRICANT $3,517 $1,200 Implemented
SU0182 # 03 Y:2004 03 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,773 $381 Implemented
SU0182 # 02 Y:2004 02 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $174 $0 Implemented
WV0284 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $3,396 $250 Implemented
WV0284 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $938 $0 Implemented
WV0284 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $880 $1,200 Implemented