IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0311 # 07 Y:2024 07 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $510 $0 n/a
TT0311 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,792 $3,400 n/a
TT0311 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,298 $1,735 n/a
TT0311 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,187 $9,000 n/a
TT0311 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,957 $30 n/a
TT0311 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $10,039 $16,000 n/a
TT0311 # 01 Y:2024 01 2024 INSTALL OCCUPANCY SENSORS $52,706 $69,233 n/a
TT0267 # 01 Y:2022 01 2022 DIRECT WARMEST AIR TO COMBUSTION INTAKE $67,587 $45,000 Not Implemented
TT0267 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $5,797 $5,000 Not Implemented
TT0267 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,489 $1,920 Not Implemented
TT0267 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,631 $17,010 Implemented
TT0267 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,510 $12,000 Not Implemented
TT0267 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $17,048 $14,849 Implemented
TT0267 # 06 Y:2022 06 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,445 $5,000 Not Implemented
TT0267 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,038 $18,000 Implemented
TT0254 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $7,171 $300 Not Implemented
TT0254 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,052 $6,750 Not Implemented
TT0254 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,875 $4,500 Not Implemented
TT0254 # 06 Y:2021 06 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,452 $1,923 Not Implemented
TT0254 # 02 Y:2021 02 2021 OPTIMIZE PLANT POWER FACTOR $42,725 $52,500 Not Implemented
TT0254 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $132,788 $431,774 Not Implemented
TT0248 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $7,421 $11,190 Implemented
TT0248 # 01 Y:2021 01 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $852,090 $500,000 Not Implemented
TT0248 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $43,748 $61,200 Not Implemented
TT0243 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,111 $600 Implemented