Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0207 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,008 | $3,433 | Implemented |
UU0207 # 03 Y:2022 | 03 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,884 | $750 | Implemented |
UU0207 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,250 | $5,000 | Not Implemented |
UU0207 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,912 | $1,585 | Implemented |
UU0207 # 08 Y:2022 | 08 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $265 | $750 | Implemented |
UU0207 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $1,700 | Implemented |
UU0207 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $1,000 | Implemented |
UU0207 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $15,757 | $75,487 | Not Implemented |
UU0181 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,737 | $860 | Implemented |
UU0181 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,017 | $14,979 | Implemented |
UU0181 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,604 | $16,880 | Implemented |
UU0181 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $20,172 | $4,900 | Not Implemented |
UU0181 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,862 | $88,688 | Implemented |
UU0159 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,384 | $1,000 | Not Implemented |
UU0159 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $38,476 | $12,000 | Implemented |
UU0159 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,454 | $16,900 | Not Implemented |
UU0159 # 01 Y:2020 | 01 | 2020 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $190,938 | $844,579 | Not Implemented |
UU0159 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $47,066 | $8,500 | Implemented |
UU0134 # 03 Y:2018 | 03 | 2018 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $8,796 | $22,888 | Not Implemented |
UU0134 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,606 | $2,052 | Not Implemented |
UU0134 # 05 Y:2018 | 05 | 2018 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,549 | $0 | Implemented |
UU0134 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $599,971 | $264,049 | Not Implemented |
UU0134 # 02 Y:2018 | 02 | 2018 | IMPROVE COMBUSTION CONTROL CAPABILITY | $19,372 | $15,000 | Not Implemented |
UU0133 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,825 | $0 | Not Implemented |
UU0133 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,767 | $5,679 | Implemented |