IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1408 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $217,346 $140,476 Not Implemented
UK1408 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $36,000 $32,528 Implemented
UK1408 # 04 Y:2014 04 2014 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $40,960 $204,000 Not Implemented
UK1408 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,448 $2,000 Implemented
UK1408 # 01 Y:2014 01 2014 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $15,613 $3,894 Not Implemented
UK1408 # 03 Y:2014 03 2014 UPGRADE CONTROLS ON COMPRESSORS $7,600 $17,000 Not Implemented
UK1408 # 07 Y:2014 07 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $580,500 $386,500 Not Implemented
OK0898 # 02 Y:2014 02 2014 INSTALL SET-BACK TIMERS $3,689 $1,965 Not Implemented
OK0898 # 13 Y:2014 13 2014 REPLACE TREATED WATER WITH WELL / SURFACE WATER $10,867 $27,400 Not Implemented
OK0898 # 12 Y:2014 12 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,273 $45,000 Not Implemented
OK0898 # 11 Y:2014 11 2014 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $89,952 $75,900 Not Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0898 # 09 Y:2014 09 2014 INSULATE BARE EQUIPMENT $90 $178 Not Implemented
OK0898 # 08 Y:2014 08 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,045 $1,060 Not Implemented
OK0898 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $463 Implemented
OK0898 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,345 $5,971 Not Implemented
OK0898 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $303 $270 Implemented
OK0898 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,132 $1,689 Implemented
OK0898 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $11,014 Not Implemented
OK0898 # 01 Y:2014 01 2014 USE RADIANT HEATER FOR SPOT HEATING $12,191 $15,000 Not Implemented
NC0525 # 10 Y:2014 10 2014 DEVELOP A REPAIR/REPLACE POLICY $1,232 $4,256 Not Implemented
NC0525 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $114 $60 Not Implemented
NC0525 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $134 $200 Not Implemented
NC0525 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $804 $1,000 Not Implemented
NC0525 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $359 $650 Not Implemented