Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
91
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0535 # 01 Y:2022 | 01 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,534 | $44,427 | Implemented |
AS0535 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,081 | $17,428 | Not Implemented |
AS0535 # 04 Y:2022 | 04 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $539 | $156 | Implemented |
AS0535 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,698 | $7,427 | Not Implemented |
WV0635 # 02 Y:2022 | 02 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $4,325 | $5,360 | Not Implemented |
WV0635 # 11 Y:2022 | 11 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $57 | $88 | Implemented |
WV0635 # 10 Y:2022 | 10 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $546 | $1,571 | Implemented |
WV0635 # 09 Y:2022 | 09 | 2022 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $672 | $1,500 | Implemented |
WV0635 # 07 Y:2022 | 07 | 2022 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,027 | $394 | Implemented |
WV0635 # 01 Y:2022 | 01 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,179 | $6,500 | Not Implemented |
WV0635 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,990 | $4,945 | Implemented |
WV0635 # 04 Y:2022 | 04 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $3,209 | $6,354 | Not Implemented |
WV0635 # 05 Y:2022 | 05 | 2022 | INSTALL SET-BACK TIMERS | $3,167 | $1,125 | Not Implemented |
WV0635 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,309 | $218 | Implemented |
WV0635 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $949 | $525 | Implemented |
UU0207 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $1,000 | Implemented |
UU0207 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,912 | $1,585 | Implemented |
UU0207 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $1,700 | Implemented |
UU0207 # 03 Y:2022 | 03 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,884 | $750 | Implemented |
UU0207 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,250 | $5,000 | Not Implemented |
UU0207 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $15,757 | $75,487 | Not Implemented |
UU0207 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,008 | $3,433 | Implemented |
UU0207 # 08 Y:2022 | 08 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $265 | $750 | Implemented |
UF0582 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $3,357,648 | $12,825,000 | Not Implemented |
UF0582 # 11 Y:2022 | 11 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $14,868 | $12,700 | Not Implemented |