Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsNAICS | 327 | Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0676 # 04 Y:2024 | 04 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $3,482 | $1,197 | Implemented |
WV0676 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,979 | $653 | Implemented |
WV0676 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,075 | $3,893 | Implemented |
WV0676 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $64,709 | $86,472 | Not Implemented |
WV0676 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $49 | $140 | Implemented |
WV0676 # 02 Y:2024 | 02 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,780 | $5,200 | Implemented |
WV0676 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $329 | $1,415 | Not Implemented |
WV0676 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,750 | $6,504 | Not Implemented |
UL2411 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,308 | $50,000 | n/a |
UL2411 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,372 | $5,000 | n/a |
UL2411 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,053 | $13,653 | n/a |
UL2411 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,995 | n/a |
UL2411 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $746 | $2,700 | n/a |
UL2411 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $76,606 | $698,579 | n/a |
UA0288 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,645 | $1,000 | n/a |
UA0288 # 03 Y:2024 | 03 | 2024 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,549 | $1,031 | n/a |
UA0288 # 01 Y:2024 | 01 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,634 | $1,046 | n/a |
UA0288 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,987 | $8,591 | n/a |
UA0288 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $1,656 | $994 | n/a |
UA0288 # 09 Y:2024 | 09 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,856 | $4,621 | n/a |
UA0288 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,178 | $10,450 | n/a |
UA0288 # 06 Y:2024 | 06 | 2024 | OPTIMIZE PLANT POWER FACTOR | $8,607 | $5,049 | n/a |
UA0288 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $290,423 | $2,558,734 | n/a |
TT0316 # 05 Y:2024 | 05 | 2024 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $18,330 | $3,200 | Implemented |
TT0316 # 10 Y:2024 | 10 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,587 | $1,500 | Not Implemented |