IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0573 # 07 Y:2010 07 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $270 $105 Implemented
DL0048 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,056 $100 Not Implemented
DL0048 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,459 $100 Implemented
DL0048 # 03 Y:2010 03 2010 INSTALL TIMERS AND/OR THERMOSTATS $6,420 $112 Implemented
DL0048 # 04 Y:2010 04 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,452 $1,310 Not Implemented
DL0048 # 05 Y:2010 05 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,596 $0 Implemented
DL0048 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,760 $1,050 Not Implemented
DL0048 # 07 Y:2010 07 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,000 $41,400 Not Implemented
CO0633 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,340 $2,810 Not Implemented
CO0633 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $1,000 Implemented
CO0633 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,750 $7,500 Not Implemented
CO0633 # 04 Y:2010 04 2010 INSULATE BARE EQUIPMENT $1,210 $430 Not Implemented
CO0633 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,680 $25,000 Implemented
CO0633 # 06 Y:2010 06 2010 USE SOLAR HEAT TO MAKE ELECTRICTY $3,550 $21,000 Not Implemented
SU0292 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,577 $0 Not Implemented
SU0292 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $4,309 $46 Implemented
SU0292 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,292 $962 Implemented
SU0292 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,754 $5,714 Not Implemented
SU0292 # 05 Y:2010 05 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $274 $560 Not Implemented
SU0292 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,377 $81,156 Not Implemented
SU0292 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $57,316 $175,000 Not Implemented
SU0292 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $12,124 $37,200 Not Implemented
SU0292 # 09 Y:2010 09 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,849 $24,883 Not Implemented
SU0292 # 10 Y:2010 10 2010 MOVE BOILER TO MORE EFFICIENT LOCATION $6,648 $60,575 Not Implemented