IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
NAICS 327 Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0181 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $31,353 $38,924 Not Implemented
TT0181 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $12,441 $27,333 Not Implemented
TT0181 # 06 Y:2016 06 2016 RECOVER WASTE HEAT FROM EQUIPMENT $6,973 $6,000 Implemented
TT0181 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,976 $13,245 Implemented
TT0181 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $25,164 $10,000 Implemented
TT0181 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,794 $500 Not Implemented
TT0181 # 10 Y:2016 10 2016 OPTIMIZE PLANT POWER FACTOR $3,012 $8,000 Implemented
TT0181 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,058 $3,050 Implemented
TT0181 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $35,984 $24,000 Not Implemented
UA0170 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $40,043 $13,993 Not Implemented
UA0170 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $496 $870 Implemented
UA0170 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,100 $350 Not Implemented
UA0170 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,533 $1,115 Implemented
UA0170 # 04 Y:2016 04 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,881 $7,219 Implemented
UA0170 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $7,746 $0 Not Implemented
UA0170 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,349 $27,272 Implemented
BS0086 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,268 $147 Not Implemented
BS0086 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $280 Implemented
BS0086 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,877 $1,280 Implemented
BS0086 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $12,315 $14,270 Not Implemented
BS0086 # 02 Y:2016 02 2016 REPLACE BOILER $4,643 $61,724 Not Implemented
AM0713 # 01 Y:2016 01 2016 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $453,910 $3,100,000 Not Implemented
AM0713 # 04 Y:2016 04 2016 USE SYNTHETIC LUBRICANT $4,600 $0 Implemented
AM0713 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $58,650 $76,000 Implemented
AM0713 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,870 $16,220 Implemented