IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

224

matching recommendations
Reset
NAICS 32711 Pottery, Ceramics, and Plumbing Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0022 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,172 $180 Implemented
UW0022 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $2,130 $1,260 Not Implemented
UW0022 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,849 $14,505 Not Implemented
SU0271 # 01 Y:2008 01 2008 $2,751 $0 Not Implemented
SU0271 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $36,827 $3,125 Not Implemented
SU0271 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,435 $2,841 Not Implemented
SU0271 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,111 $1,559 Not Implemented
SU0271 # 05 Y:2008 05 2008 INSULATE FEEDWATER TANK $3,428 $746 Not Implemented
SU0271 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $773 $249 Not Implemented
SU0271 # 07 Y:2008 07 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $31,841 $16,299 Not Implemented
SU0271 # 08 Y:2008 08 2008 REPLACE BOILER $199,772 $200,000 Not Implemented
SU0271 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,088 $52,435 Implemented
SU0271 # 10 Y:2008 10 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $747 $1,615 Not Implemented
SU0271 # 11 Y:2008 11 2008 OPTIMIZE PLANT POWER FACTOR $7,023 $25,839 Not Implemented
LL0264 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $818,045 $90,421 Implemented
LL0264 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $243,412 $19,445 Implemented
LL0264 # 03 Y:2007 03 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $53,421 $607 Implemented
LL0264 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,045 $3,640 Implemented
LL0264 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $12,108 $780 Implemented
LL0264 # 06 Y:2007 06 2007 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,327 $450 Not Implemented
LL0264 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,490 $30 Implemented
LL0264 # 08 Y:2007 08 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $965 $240 Not Implemented
LL0264 # 09 Y:2007 09 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $667 $623 Not Implemented
LL0264 # 10 Y:2007 10 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $602 $1,379 Not Implemented
LL0264 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $388 Implemented