IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 32711 Pottery, Ceramics, and Plumbing Fixture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0635 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $3,209 $6,354 Not Implemented
WV0635 # 01 Y:2022 01 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,179 $6,500 Not Implemented
WV0635 # 02 Y:2022 02 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $4,325 $5,360 Not Implemented
WV0635 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,309 $218 Implemented
WV0635 # 11 Y:2022 11 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $57 $88 Implemented
WV0635 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,990 $4,945 Implemented
WV0635 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $949 $525 Implemented
WV0635 # 10 Y:2022 10 2022 DEVELOP A REPAIR/REPLACE POLICY $546 $1,571 Implemented
WV0635 # 05 Y:2022 05 2022 INSTALL SET-BACK TIMERS $3,167 $1,125 Not Implemented
WV0635 # 07 Y:2022 07 2022 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,027 $394 Implemented
WV0635 # 09 Y:2022 09 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $672 $1,500 Implemented
WV0576 # 06 Y:2019 06 2019 DEVELOP A REPAIR/REPLACE POLICY $10,175 $833 Implemented
WV0576 # 05 Y:2019 05 2019 RECYCLE WHITE WATER $10,243 $11,900 Not Implemented
WV0576 # 04 Y:2019 04 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $13,307 $1,000 Implemented
WV0576 # 03 Y:2019 03 2019 UPGRADE CONTROLS ON COMPRESSORS $51,831 $25,750 Not Implemented
WV0576 # 07 Y:2019 07 2019 INSTALL OCCUPANCY SENSORS $5,850 $2,860 Implemented
WV0576 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,463 $0 Not Implemented
WV0576 # 02 Y:2019 02 2019 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $141,742 $375,000 Not Implemented
WV0576 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $274,752 $432,000 Not Implemented
WV0576 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,759 $2,875 Implemented
WV0418 # 13 Y:2010 13 2010 RECOVER WASTE HEAT FROM EQUIPMENT $6,837 $3,870 Not Implemented
WV0418 # 12 Y:2010 12 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,456 $5,095 Implemented
WV0418 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,872 $35,956 Implemented
WV0418 # 06 Y:2010 06 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $33,207 $16,040 Not Implemented
WV0418 # 05 Y:2010 05 2010 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $35,021 $47,775 Not Implemented