IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0556 # 08 Y:2015 08 2015 INSTALL OCCUPANCY SENSORS $578 $868 Implemented
UK1512 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,559 $0 Implemented
UK1512 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,043 $1,215 Not Implemented
UK1512 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,250 $4,650 Not Implemented
UK1512 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,209 $3,940 Implemented
UK1512 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,263 $178 Not Implemented
UK1512 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,652 $1,750 Implemented
UK1512 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $4,297 $12,750 Not Implemented
UK1512 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,248 $7,985 Not Implemented
UK1512 # 09 Y:2015 09 2015 INSULATE FEEDWATER TANK $1,278 $994 Implemented
UK1512 # 10 Y:2015 10 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,609 $1,500 Implemented
UK1512 # 11 Y:2015 11 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,535 $530 Not Implemented
UK1512 # 12 Y:2015 12 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $277 $475 Not Implemented
SD0513 # 01 Y:2015 01 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,628 $42,560 Not Implemented
SD0513 # 02 Y:2015 02 2015 COVER OPEN TANKS $4,719 $415 Not Implemented
SD0513 # 03 Y:2015 03 2015 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,873 $200 Not Implemented
SD0513 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,240 $2,500 Not Implemented
SD0513 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $505 $350 Not Implemented
SD0513 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $356 $72 Not Implemented
UD0931 # 01 Y:2015 01 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $108,029 $0 Not Implemented
UD0931 # 02 Y:2015 02 2015 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $185,788 $193 Not Implemented
UD0931 # 03 Y:2015 03 2015 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $171,582 $16,050 Not Implemented
UD0931 # 04 Y:2015 04 2015 DEVELOP A REPAIR/REPLACE POLICY $1,102 $3,250 Not Implemented
UD0931 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,304 $0 Implemented
UD0931 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,502 $151,300 Implemented