IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0616 # 10 Y:2018 10 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,190 $500 Not Implemented
NC0616 # 09 Y:2018 09 2018 AVOID REWINDING MOTORS MORE THAN TWICE $2,586 $5,865 Implemented
NC0616 # 08 Y:2018 08 2018 REDESIGN PROCESS $36,741 $2,500 Implemented
NC0616 # 07 Y:2018 07 2018 INSTALL SENSORS TO DETECT DEFECTS $112,500 $150,000 Implemented
NC0616 # 06 Y:2018 06 2018 REDESIGN PROCESS $7,804 $10,000 Not Implemented
NC0616 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,999 $100 Implemented
NC0616 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,380 $20,000 Not Implemented
NC0616 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $505 $50 Implemented
NC0616 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,695 $225 Implemented
NC0616 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,771 $43,490 Implemented
NC0374 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,915 $100,000 Implemented
NC0374 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,040 $7,000 Implemented
NC0374 # 04 Y:2008 04 2008 REDESIGN PROCESS $11,653 $22,000 Not Implemented
NC0374 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,977 $100 Implemented
NC0374 # 02 Y:2008 02 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,372 $18,000 Implemented
NC0374 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $32,923 $63,000 Implemented
NC0356 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,291 $30,000 Not Implemented
NC0356 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $798 $500 Not Implemented
NC0356 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,456 $100 Implemented
NC0356 # 03 Y:2007 03 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,040 $13,725 Not Implemented
NC0356 # 02 Y:2007 02 2007 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $20,393 $10,000 Implemented