IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0647 # 01 Y:2023 01 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $82,721 $146,400 Not Implemented
WV0647 # 06 Y:2023 06 2023 UPGRADE CONTROLS ON COMPRESSORS $3,789 $6,450 Not Implemented
WV0647 # 05 Y:2023 05 2023 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $4,595 $9,440 Implemented
WV0647 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,516 $864 Implemented
WV0647 # 03 Y:2023 03 2023 MINIMIZE WATER USAGE $7,590 $11,644 Implemented
WV0647 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,420 $19,102 Implemented
WV0647 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,411 $1,508 Implemented
WV0647 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,315 $114 Implemented
WV0647 # 09 Y:2023 09 2023 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $2,777 $9,380 Not Implemented
WV0647 # 10 Y:2023 10 2023 REDUCE VENTILATION AIR $2,625 $5,002 Not Implemented
WV0647 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $1,681 $195 Implemented
WV0613 # 02 Y:2021 02 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,135 $10,700 Implemented
WV0613 # 08 Y:2021 08 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $177 $40 Implemented
WV0613 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $536 $96 Implemented
WV0613 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $2,061 $3,373 Implemented
WV0613 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,713 $7,054 Not Implemented
WV0613 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $10,812 $30,758 Implemented
WV0613 # 03 Y:2021 03 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,092 $53,040 Not Implemented
WV0613 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,166 $73,920 Not Implemented
WV0612 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,798 $7,637 Not Implemented
WV0612 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,641 $4,320 Implemented
WV0612 # 04 Y:2021 04 2021 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $13,924 $27,550 Not Implemented
WV0612 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,446 $16,700 Implemented
WV0612 # 01 Y:2021 01 2021 CONVERT TO OXYFUEL BURNERS $30,507 $81,760 Not Implemented
WV0612 # 10 Y:2021 10 2021 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $701 $397 Implemented