IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
NAICS 3272 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0765 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $71,530 $81,610 Implemented
AM0765 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,060 $1,000 Implemented
AM0765 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,210 $22 Not Implemented
AM0765 # 05 Y:2018 05 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,740 $0 Implemented
AM0765 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $510 $595 Implemented
AM0765 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $173,300 $721,800 Not Implemented
NC0616 # 08 Y:2018 08 2018 REDESIGN PROCESS $36,741 $2,500 Implemented
NC0616 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,695 $225 Implemented
NC0616 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,771 $43,490 Implemented
NC0616 # 07 Y:2018 07 2018 INSTALL SENSORS TO DETECT DEFECTS $112,500 $150,000 Implemented
NC0616 # 09 Y:2018 09 2018 AVOID REWINDING MOTORS MORE THAN TWICE $2,586 $5,865 Implemented
NC0616 # 10 Y:2018 10 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,190 $500 Not Implemented
NC0616 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,380 $20,000 Not Implemented
NC0616 # 05 Y:2018 05 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,999 $100 Implemented
NC0616 # 06 Y:2018 06 2018 REDESIGN PROCESS $7,804 $10,000 Not Implemented
NC0616 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $505 $50 Implemented
AM0754 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,555 $3,232 Implemented
AM0754 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,670 $1,000 Implemented
AM0754 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $7,740 $11,520 Implemented
AM0754 # 01 Y:2018 01 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $63,539 $195,000 Implemented
AM0754 # 05 Y:2018 05 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,270 $350 Not Implemented
AM0754 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $0 Not Implemented
AM0754 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $9 Implemented
AM0754 # 07 Y:2018 07 2018 USE SYNTHETIC LUBRICANT $312 $0 Implemented
SF0518 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $2,300 Not Implemented