IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

757

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0407 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,719 $38,791 Implemented
IA0407 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $3,657 $4,543 Implemented
IA0407 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,366 $1,000 Implemented
IA0407 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,084 $12,025 Implemented
IA0407 # 07 Y:2007 07 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,709 $16,692 Not Implemented
MA0618 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,879 $79,554 Implemented
MA0618 # 02 Y:2007 02 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,820 $26,621 Implemented
MA0618 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,316 $3,220 Implemented
MA0618 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,204 $29,875 Implemented
MA0618 # 05 Y:2007 05 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,589 $17,740 Implemented
MA0618 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $7,795 $1,924 Implemented
MA0618 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $4,906 $18,500 Implemented
MA0618 # 08 Y:2007 08 2007 INSTALL TIMERS AND/OR THERMOSTATS $4,125 $3,552 Implemented
MA0618 # 09 Y:2007 09 2007 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,070 $340 Implemented
LL0272 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $102,410 $49,360 Not Implemented
LL0272 # 02 Y:2007 02 2007 INSULATE BARE EQUIPMENT $58,782 $19,636 Implemented
LL0272 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,485 $7,000 Not Implemented
LL0272 # 04 Y:2007 04 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $7,489 $422 Not Implemented
LL0272 # 05 Y:2007 05 2007 INSTALL SKYLIGHTS $2,828 $5,040 Not Implemented
LL0272 # 06 Y:2007 06 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,024 $1,499 Not Implemented
LL0272 # 07 Y:2007 07 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $832 $830 Not Implemented
LL0272 # 08 Y:2007 08 2007 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,020 $2,338 Not Implemented
LL0272 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $903 $1,169 Not Implemented
LL0272 # 10 Y:2007 10 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $517 $5,436 Not Implemented
SU0254 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,902 $0 Implemented