IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 32721 Glass and Glass Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0588 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,235 $100 n/a
LE0588 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,412 $1,256 n/a
LE0588 # 04 Y:2025 04 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,600 $26,934 n/a
LE0588 # 05 Y:2025 05 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $25,169 $56,274 n/a
LE0588 # 06 Y:2025 06 2025 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $938 $2,500 n/a
LE0588 # 07 Y:2025 07 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $175,084 $635,000 n/a
LE0588 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $38 $140 n/a
LE0588 # 01 Y:2025 01 2025 PAY UTILITY BILLS ON TIME $1,523 $0 n/a
SU0254 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $440 $69 Implemented
SU0254 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,048 $381 Implemented
SU0254 # 04 Y:2007 04 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $18,564 $2,486 Not Implemented
SU0254 # 03 Y:2007 03 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,618 $0 Implemented
SU0254 # 02 Y:2007 02 2007 USE SYNTHETIC LUBRICANT $3,743 $0 Implemented
SU0254 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,902 $0 Implemented
SU0254 # 07 Y:2007 07 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $25,275 $12,148 Implemented
SU0254 # 08 Y:2007 08 2007 INSTALL OCCUPANCY SENSORS $24,092 $13,688 Implemented
SU0254 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,567 $63,450 Implemented
SU0254 # 11 Y:2007 11 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,604 $6,140 Implemented
SU0254 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $694 $909 Implemented
SU0254 # 10 Y:2007 10 2007 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $86,095 $97,983 Not Implemented
SU0238 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $86 $127 Implemented
SU0238 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,073 $578 Implemented
SU0238 # 05 Y:2006 05 2006 DISCONNECT BALLASTS $788 $0 Implemented
SU0238 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $1,534 $0 Not Implemented
SU0238 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,431 $0 Not Implemented