IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
NAICS 327211 Flat Glass Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0931 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,937 $41,800 Implemented
UD0931 # 11 Y:2015 11 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,127 $9,200 Not Implemented
UD0931 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,628 $83,660 Implemented
WM0007 # 01 Y:2012 01 2012 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,505 $0 Not Implemented
WM0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,425 $125 Implemented
WM0007 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,646 $0 Not Implemented
WM0007 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,789 $250 Not Implemented
WM0007 # 05 Y:2012 05 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,041 $200 Not Implemented
WM0007 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $34,161 $123,125 Not Implemented
UF0442 # 01 Y:2011 01 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $366 $0 Not Implemented
UF0442 # 02 Y:2011 02 2011 INSTALL SKYLIGHTS $1,404 $3,128 Not Implemented
UF0442 # 03 Y:2011 03 2011 INSULATE BARE EQUIPMENT $527 $33 Not Implemented
UF0442 # 04 Y:2011 04 2011 INSTALL REPLACEMENT DOORS $588 $1,150 Not Implemented
UF0442 # 05 Y:2011 05 2011 INSTALL TIMERS AND/OR THERMOSTATS $1,489 $1,079 Not Implemented
UF0442 # 06 Y:2011 06 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $168 $172 Not Implemented
UF0442 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,230 $685 Not Implemented
UF0442 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,229 $0 Not Implemented
UF0442 # 09 Y:2011 09 2011 UPGRADE CONTROLS ON COMPRESSORS $648 $410 Not Implemented
UF0442 # 10 Y:2011 10 2011 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,613 $0 Not Implemented
AM0580 # 01 Y:2010 01 2010 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $696,440 $2,700,000 Not Implemented
AM0580 # 02 Y:2010 02 2010 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $627,000 $0 Not Implemented
AM0580 # 03 Y:2010 03 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $100,670 $0 Implemented
AM0580 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83,545 $208,000 Not Implemented
AM0580 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,000 $1,000 Implemented
AM0580 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,930 $150 Not Implemented