IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
NAICS 327211 Flat Glass Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1096 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $394,679 $75,000 n/a
OK1096 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96,791 $464,597 n/a
OK1096 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,865 $10,337 n/a
OK1096 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $148,192 $1,704,000 n/a
OK1096 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,151 $0 n/a
OK1096 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $593 $1,354 n/a
OK1096 # 08 Y:2023 08 2023 MAINTAIN MACHINES TO REDUCE LEAKS $2,796 $500 n/a
OK1096 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,239 $0 n/a
AM0765 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $510 $595 Implemented
AM0765 # 05 Y:2018 05 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,740 $0 Implemented
AM0765 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,210 $22 Not Implemented
AM0765 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,060 $1,000 Implemented
AM0765 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $71,530 $81,610 Implemented
AM0765 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $173,300 $721,800 Not Implemented
AM0580 # 10 Y:2010 10 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,270 $12,630 Not Implemented
AM0580 # 12 Y:2010 12 2010 INSTALL SKYLIGHTS $220 $530 Not Implemented
AM0580 # 11 Y:2010 11 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $470 $120 Not Implemented
AM0580 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,143 $1,880 Not Implemented
AM0580 # 08 Y:2010 08 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,950 $34,200 Implemented
AM0580 # 07 Y:2010 07 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,780 $1,520 Implemented
AM0580 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,930 $150 Not Implemented
AM0580 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,000 $1,000 Implemented
AM0580 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83,545 $208,000 Not Implemented
AM0580 # 03 Y:2010 03 2010 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $100,670 $0 Implemented
AM0580 # 02 Y:2010 02 2010 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $627,000 $0 Not Implemented