IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

176

matching recommendations
Reset
NAICS 327212 Other Pressed and Blown Glass and Glassware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0612 # 06 Y:2021 06 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,641 $4,320 Implemented
WV0612 # 08 Y:2021 08 2021 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,683 $8,044 Not Implemented
WV0612 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,798 $7,637 Not Implemented
WV0612 # 02 Y:2021 02 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $22,389 $99,385 Not Implemented
WV0612 # 11 Y:2021 11 2021 INSTALL SET-BACK TIMERS $611 $1,110 Implemented
WV0612 # 10 Y:2021 10 2021 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $701 $397 Implemented
WV0612 # 01 Y:2021 01 2021 CONVERT TO OXYFUEL BURNERS $30,507 $81,760 Not Implemented
WV0612 # 04 Y:2021 04 2021 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $13,924 $27,550 Not Implemented
WV0612 # 09 Y:2021 09 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,090 $1,341 Not Implemented
WV0612 # 03 Y:2021 03 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,446 $16,700 Implemented
WV0612 # 07 Y:2021 07 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,008 $8,132 Implemented
SF0518 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,611 $15,000 Not Implemented
SF0518 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $2,300 Not Implemented
SF0518 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,220 $4,857 Not Implemented
SF0518 # 01 Y:2018 01 2018 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $13,874 $3,023 Not Implemented
SF0518 # 05 Y:2018 05 2018 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,098 $6,325 Not Implemented
SF0518 # 06 Y:2018 06 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $6,223 $45,702 Not Implemented
MZ0250 # 02 Y:2018 02 2018 RECOVER WASTE HEAT FROM EQUIPMENT $27,014 $65,000 Not Implemented
MZ0250 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,351 $5,600 Implemented
MZ0250 # 04 Y:2018 04 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,697 $0 Implemented
MZ0250 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $1,786 $280 Implemented
WV0547 # 07 Y:2017 07 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $563 $700 Not Implemented
WV0547 # 06 Y:2017 06 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $970 $4,600 Implemented
WV0547 # 05 Y:2017 05 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,360 $2,700 Not Implemented
WV0547 # 11 Y:2017 11 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $133 $25 Not Implemented