IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 327212 Other Pressed and Blown Glass and Glassware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0556 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,438 $12,000 Implemented
NC0556 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,806 $5,000 Not Implemented
NC0556 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $59,808 $90,000 Implemented
LE0396 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $214 $105 Implemented
LE0396 # 05 Y:2015 05 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,534 $1,644 Implemented
LE0396 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,473 $1,950 Not Implemented
LE0396 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $405 $1,000 Implemented
LE0396 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $9,400 Not Implemented
LE0396 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,431 $13,983 Not Implemented
LE0396 # 10 Y:2015 10 2015 REPLACE BOILER $4,068 $18,400 Not Implemented
LE0396 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,080 $2,845 Implemented
LE0396 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,655 $4,000 Not Implemented
LE0396 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $702 $35 Implemented
UD0923 # 10 Y:2015 10 2015 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $343 $0 Implemented
UD0923 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $4,777 $600 Not Implemented
UD0923 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,909 $10,000 Not Implemented
UD0923 # 03 Y:2015 03 2015 USE OPTIMUM THICKNESS INSULATION $28,993 $2,000 Not Implemented
UD0923 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,241 $50 Implemented
UD0923 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,021 $400 Not Implemented
UD0923 # 02 Y:2015 02 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $243 $400 Not Implemented
UD0923 # 07 Y:2015 07 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,734 $0 Implemented
UD0923 # 09 Y:2015 09 2015 COMBINE UTILITY METERS $105,406 $156,400 Not Implemented
UD0923 # 08 Y:2015 08 2015 DEVELOP A REPAIR/REPLACE POLICY $5,978 $19,581 Implemented
MAS031 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,640 $200 Not Implemented
MAS031 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $593 $425 Implemented