IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations

45

matching recommendations
Reset
NAICS 327213 Glass Container Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0981 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $16,309 $4,937 Not Implemented
OK0981 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,815 $0 Not Implemented
OK0981 # 01 Y:2018 01 2018 UPGRADE CONTROLS ON COMPRESSORS $124,716 $75,000 Implemented
OK0981 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $11,423 $50,570 Not Implemented
OK0981 # 05 Y:2018 05 2018 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $353,111 $2,500,000 Not Implemented
OK0981 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,343 $69,050 Not Implemented
DL0169 # 04 Y:2016 04 2016 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,060 $5,000 Not Implemented
DL0169 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $300,500 $1,937,040 Not Implemented
DL0169 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $11,160 $11,160 Not Implemented
DL0169 # 03 Y:2016 03 2016 ADJUST BURNERS FOR EFFICIENT OPERATION $117,000 $34,000 Not Implemented
DL0169 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $13,120 $2,500 Implemented
DL0169 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $163,600 $12,000 Not Implemented
MZ0145 # 09 Y:2014 09 2014 USE PHOTOCELL CONTROLS $1,686 $2,450 Implemented
MZ0145 # 08 Y:2014 08 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,868 $0 Implemented
MZ0145 # 01 Y:2014 01 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $89,896 $277,500 Not Implemented
MZ0145 # 02 Y:2014 02 2014 INSULATE BARE EQUIPMENT $105,420 $300,000 Implemented
MZ0145 # 03 Y:2014 03 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $192,210 $220,000 Implemented
MZ0145 # 04 Y:2014 04 2014 UPGRADE CONTROLS ON COMPRESSORS $113,101 $200,000 Implemented
MZ0145 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $629 $1,000 Not Implemented
MZ0145 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,814 $30,000 Implemented
MZ0145 # 07 Y:2014 07 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,268 $0 Implemented
UW0028 # 07 Y:2009 07 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $847 $560 Not Implemented
UW0028 # 06 Y:2009 06 2009 METER WASTE WATER $1,060 $12,000 Implemented
UW0028 # 05 Y:2009 05 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,663 $31,539 Not Implemented
UW0028 # 04 Y:2009 04 2009 INSTALL OCCUPANCY SENSORS $12,524 $1,960 Implemented