Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
669
matching recommendationsNAICS | 3273 | Cement and Concrete Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0004 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,544 | $238 | Implemented |
SJ0004 # 03 Y:2023 | 03 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $96 | $171 | Not Implemented |
SJ0004 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,799 | $3,878 | Implemented |
SJ0004 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $163 | $0 | Not Implemented |
UW2305 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $704 | $4,074 | Implemented |
UW2305 # 02 Y:2023 | 02 | 2023 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $3,266 | $4,565 | Implemented |
UW2305 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,115 | $5,102 | Implemented |
UW2305 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,031 | $0 | Implemented |
AS0535 # 01 Y:2022 | 01 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,534 | $44,427 | Implemented |
AS0535 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,698 | $7,427 | Not Implemented |
AS0535 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,081 | $17,428 | Not Implemented |
AS0535 # 04 Y:2022 | 04 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $539 | $156 | Implemented |
UU0207 # 08 Y:2022 | 08 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $265 | $750 | Implemented |
UU0207 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $1,700 | Implemented |
UU0207 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $1,000 | Implemented |
UU0207 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,912 | $1,585 | Implemented |
UU0207 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,008 | $3,433 | Implemented |
UU0207 # 03 Y:2022 | 03 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,884 | $750 | Implemented |
UU0207 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $15,757 | $75,487 | Not Implemented |
UU0207 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,250 | $5,000 | Not Implemented |
UF0582 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $3,357,648 | $12,825,000 | Not Implemented |
UF0582 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,189,637 | $2,090,000 | Not Implemented |
UF0582 # 03 Y:2022 | 03 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $506,910 | $647,662 | Not Implemented |
UF0582 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $226,296 | $102,253 | Implemented |
UF0582 # 05 Y:2022 | 05 | 2022 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $207,860 | $705,580 | Not Implemented |