IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

619

matching recommendations
Reset
NAICS 3273 Cement and Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0483 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $196 $226 Not Implemented
WM0154 # 01 Y:2020 01 2020 REPLACE BOILER $58,212 $300,000 Not Implemented
WM0154 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,376 $54,000 Implemented
WM0154 # 03 Y:2020 03 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,697 $2,500 Not Implemented
WM0154 # 04 Y:2020 04 2020 PAY UTILITY BILLS ON TIME $1,563 $0 Implemented
WM0154 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,436 $3,500 Implemented
WM0154 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,228 $1,500 Implemented
WM0154 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $599 $1,500 Implemented
UU0159 # 01 Y:2020 01 2020 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $190,938 $844,579 Not Implemented
UU0159 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $47,066 $8,500 Implemented
UU0159 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,476 $12,000 Implemented
UU0159 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,384 $1,000 Not Implemented
UU0159 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,454 $16,900 Not Implemented
AM0794 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,215 $2,000 Implemented
AM0794 # 02 Y:2020 02 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,250 $2,000 Implemented
AM0794 # 03 Y:2020 03 2020 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,100 $8 Implemented
AM0794 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $990 $450 Implemented
AM0794 # 05 Y:2020 05 2020 USE SYNTHETIC LUBRICANT $801 $100 Implemented
AM0794 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $670 $7 Not Implemented
AM0794 # 07 Y:2020 07 2020 PAY UTILITY BILLS ON TIME $127 $0 Implemented
OR0724 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $10,104 $18,004 Not Implemented
OR0724 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,124 $3,891 Not Implemented
OR0724 # 03 Y:2019 03 2019 REPAIR AND ELIMINATE STEAM LEAKS $49,629 $100,000 Not Implemented
OR0724 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,637 $3,836 Not Implemented
OR0724 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,462 $218 Not Implemented