IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164

matching recommendations
Reset
NAICS 32733 Concrete Pipe, Brick, and Block Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0472 # 03 Y:2019 03 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,747 $2,000 Implemented
LE0472 # 06 Y:2019 06 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,558 $6,000 Not Implemented
LE0472 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $208 $285 Implemented
BS0086 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,268 $147 Not Implemented
BS0086 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,877 $1,280 Implemented
BS0086 # 03 Y:2016 03 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $280 Implemented
BS0086 # 02 Y:2016 02 2016 REPLACE BOILER $4,643 $61,724 Not Implemented
BS0086 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $12,315 $14,270 Not Implemented
BS0064 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,694 $503 Implemented
BS0064 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $5,555 $6,149 Not Implemented
BS0064 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $98 $200 Implemented
BS0064 # 04 Y:2015 04 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,050 $1,378 Not Implemented
BS0064 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,284 $2,208 Not Implemented
OK0839 # 16 Y:2013 16 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,380 $0 Not Implemented
OK0839 # 14 Y:2013 14 2013 INSULATE BARE EQUIPMENT $1,275 $912 Not Implemented
OK0839 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,514 $27,500 Implemented
OK0839 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,540 $0 Implemented
OK0839 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,395 $1,750 Implemented
OK0839 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,494 $33,218 Implemented
OK0839 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $3,114 Not Implemented
OK0839 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $667 $3,677 Not Implemented
OK0839 # 07 Y:2013 07 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,708 $5,684 Implemented
OK0839 # 13 Y:2013 13 2013 OPTIMIZE PLANT POWER FACTOR $12,090 $11,638 Implemented
OK0839 # 12 Y:2013 12 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,901 $4,994 Not Implemented
OK0839 # 09 Y:2013 09 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $873 $490 Implemented