Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsNAICS | 327420 | Gypsum Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0601 # 07 Y:2023 | 07 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $61,813 | $29,295 | Implemented |
UF0601 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,202,647 | $3,920,000 | Implemented |
UF0601 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,983 | $0 | Implemented |
UF0601 # 06 Y:2023 | 06 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $74,558 | $0 | Implemented |
UF0601 # 03 Y:2023 | 03 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $280,640 | $30,000 | Implemented |
UF0601 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $32,141 | $49,680 | Implemented |
UF0601 # 08 Y:2023 | 08 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,014 | $3,179 | Implemented |
LS2313 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,021 | $180 | Implemented |
LS2313 # 06 Y:2023 | 06 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $87,048 | $400,000 | Implemented |
LS2313 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,862 | $187 | Implemented |
LS2313 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $2,452 | $75 | Implemented |
LS2313 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,259 | $150 | Implemented |
LS2313 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,049 | $50 | Implemented |
UF0600 # 03 Y:2023 | 03 | 2023 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,976 | $11,866 | Implemented |
UF0600 # 05 Y:2023 | 05 | 2023 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,132 | $1,440 | Implemented |
UF0600 # 02 Y:2023 | 02 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $17,863 | $38,735 | Implemented |
UF0600 # 06 Y:2023 | 06 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,118 | $591 | Implemented |
UF0600 # 07 Y:2023 | 07 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $32,555 | $3,179 | Implemented |
UF0600 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,508 | $584 | Implemented |
UF0599 # 09 Y:2023 | 09 | 2023 | INSTALL TURBULATORS | $4,318 | $5,000 | Implemented |
UF0599 # 08 Y:2023 | 08 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,851 | $24,000 | Implemented |
UF0599 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,242 | $9,619 | Implemented |
UF0599 # 03 Y:2023 | 03 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $39,593 | $8,330 | Implemented |
UF0599 # 02 Y:2023 | 02 | 2023 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $57,942 | $18,000 | Implemented |
UF0599 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $31,388 | $12,420 | Implemented |