IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
NAICS 3279 Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0438 # 12 Y:2010 12 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,717 $0 Not Implemented
NC0410 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $101,033 $272,411 Not Implemented
NC0410 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,826 $100 Not Implemented
NC0410 # 03 Y:2010 03 2010 DEVELOP A REPAIR/REPLACE POLICY $569 $580 Not Implemented
NC0410 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,167 $3,040 Not Implemented
NC0410 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $118 $435 Not Implemented
NC0414 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,924 $26,000 Not Implemented
NC0414 # 02 Y:2010 02 2010 DEVELOP A REPAIR/REPLACE POLICY $1,188 $1,991 Implemented
NC0414 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $1,044 $680 Not Implemented
NC0414 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,335 $50 Implemented
NC0414 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $305 $100 Implemented
NC0414 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $556 $1,692 Implemented
NC0414 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $562 Implemented
NC0414 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $1,450 Implemented
NC0414 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $268 $499 Implemented
MI0190 # 01 Y:2010 01 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,345 $1,020 Implemented
MI0190 # 02 Y:2010 02 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,171 $2,804 Not Implemented
MI0190 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,721 $2,507 Implemented
MI0190 # 04 Y:2010 04 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,587 $700 Not Implemented
MI0190 # 05 Y:2010 05 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,758 $4,871 Not Implemented
AM0575 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,600 $5,000 Implemented
AM0575 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,350 $78,700 Not Implemented
AM0575 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $20,350 $9,350 Not Implemented
AM0575 # 04 Y:2010 04 2010 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $18,870 $170,000 Not Implemented
AM0575 # 05 Y:2010 05 2010 OPTIMIZE PLANT POWER FACTOR $18,400 $54,200 Not Implemented