IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
NAICS 3279 Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0362 # 14 Y:2007 14 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $297 $400 Implemented
UD0762 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,211 $0 Implemented
UD0762 # 02 Y:2007 02 2007 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $23,789 $95,156 Not Implemented
UD0762 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $22,493 $9,310 Not Implemented
UD0762 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,650 $33,580 Implemented
UD0762 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,048 $19,730 Not Implemented
UD0762 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,706 $7,000 Not Implemented
UD0762 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,709 $1,465 Implemented
UD0762 # 08 Y:2007 08 2007 DISCONNECT BALLASTS $1,029 $180 Not Implemented
AM0526 # 01 Y:2007 01 2007 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $29,900 $18,130 Not Implemented
AM0526 # 02 Y:2007 02 2007 OPTIMIZE PLANT POWER FACTOR $15,310 $65,120 Not Implemented
AM0526 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,200 $16,400 Not Implemented
AM0526 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,660 $500 Not Implemented
AM0526 # 05 Y:2007 05 2007 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,500 $0 Not Implemented
AM0526 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $8,650 $8,650 Not Implemented
AM0526 # 07 Y:2007 07 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,550 $0 Not Implemented
AM0526 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,545 $2,300 Not Implemented
AM0526 # 09 Y:2007 09 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,080 $2,850 Not Implemented
AM0526 # 10 Y:2007 10 2007 USE SYNTHETIC LUBRICANT $1,915 $0 Not Implemented
NC0343 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $137,000 $28,000 Not Implemented
NC0343 # 02 Y:2006 02 2006 REDESIGN PROCESS $54,257 $30,000 Not Implemented
NC0343 # 03 Y:2006 03 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $73,265 $260,000 Not Implemented
NC0343 # 04 Y:2006 04 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $18,719 $10,000 Not Implemented
NC0343 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $76,598 $14,000 Not Implemented
NC0343 # 06 Y:2006 06 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,384 $3,000 Not Implemented