IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

39

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0459 # 03 Y:2015 03 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $299,710 $30,000 Implemented
UM0459 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $982 $800 Not Implemented
UM0459 # 01 Y:2015 01 2015 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $115,156 $525,000 Not Implemented
AM0584 # 02 Y:2010 02 2010 INCREASE USE OF AUTOMATION $28,100 $14,000 Not Implemented
AM0584 # 03 Y:2010 03 2010 USE SYNTHETIC LUBRICANT $10,225 $0 Not Implemented
AM0584 # 04 Y:2010 04 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,880 $0 Not Implemented
AM0584 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,115 $6,560 Not Implemented
AM0584 # 06 Y:2010 06 2010 PAY UTILITY BILLS ON TIME $1,680 $0 Implemented
AM0584 # 07 Y:2010 07 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $880 $135 Implemented
AM0584 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $610 $100 Implemented
AM0584 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,440 $125,600 Implemented
AM0575 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,350 $78,700 Not Implemented
AM0575 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $460 Implemented
AM0575 # 10 Y:2010 10 2010 USE SYNTHETIC LUBRICANT $745 $0 Not Implemented
AM0575 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $5,523 $8,520 Not Implemented
AM0575 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,950 $450 Implemented
AM0575 # 04 Y:2010 04 2010 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $18,870 $170,000 Not Implemented
AM0575 # 05 Y:2010 05 2010 OPTIMIZE PLANT POWER FACTOR $18,400 $54,200 Not Implemented
AM0575 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $20,350 $9,350 Not Implemented
AM0575 # 06 Y:2010 06 2010 INSTALL SKYLIGHTS $13,790 $68,500 Not Implemented
AM0575 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,600 $5,000 Implemented
AM0526 # 03 Y:2007 03 2007 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $14,200 $16,400 Not Implemented
AM0526 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,660 $500 Not Implemented
AM0526 # 05 Y:2007 05 2007 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,500 $0 Not Implemented
AM0526 # 06 Y:2007 06 2007 INSTALL SKYLIGHTS $8,650 $8,650 Not Implemented