Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsNAICS | 32799 | All Other Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0399 # 02 Y:2007 | 02 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,267 | $6,700 | Not Implemented |
SD0399 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,543 | $4,247 | Not Implemented |
SD0399 # 04 Y:2007 | 04 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,157 | $5,934 | Implemented |
SD0399 # 05 Y:2007 | 05 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,129 | $0 | Not Implemented |
SD0399 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,380 | $6,025 | Implemented |
WV0362 # 09 Y:2007 | 09 | 2007 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,851 | $1,000 | Implemented |
WV0362 # 14 Y:2007 | 14 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $297 | $400 | Implemented |
WV0362 # 13 Y:2007 | 13 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $913 | $20 | Implemented |
WV0362 # 12 Y:2007 | 12 | 2007 | INSULATE BARE EQUIPMENT | $1,295 | $740 | Implemented |
WV0362 # 11 Y:2007 | 11 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,387 | $224 | Not Implemented |
WV0362 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,521 | $978 | Implemented |
WV0362 # 08 Y:2007 | 08 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $1,851 | $185 | Implemented |
WV0362 # 07 Y:2007 | 07 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,693 | $1,500 | Implemented |
WV0362 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,787 | $0 | Implemented |
WV0362 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,397 | $0 | Implemented |
WV0362 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,748 | $660 | Not Implemented |
WV0362 # 03 Y:2007 | 03 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,679 | $2,000 | Not Implemented |
WV0362 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,461 | $13,900 | Not Implemented |
WV0362 # 01 Y:2007 | 01 | 2007 | INSULATE BARE EQUIPMENT | $80,064 | $26,135 | Not Implemented |
AM0526 # 01 Y:2007 | 01 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $29,900 | $18,130 | Not Implemented |
AM0526 # 02 Y:2007 | 02 | 2007 | OPTIMIZE PLANT POWER FACTOR | $15,310 | $65,120 | Not Implemented |
AM0526 # 03 Y:2007 | 03 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $14,200 | $16,400 | Not Implemented |
AM0526 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,660 | $500 | Not Implemented |
AM0526 # 05 Y:2007 | 05 | 2007 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $10,500 | $0 | Not Implemented |
AM0526 # 06 Y:2007 | 06 | 2007 | INSTALL SKYLIGHTS | $8,650 | $8,650 | Not Implemented |