IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

142

matching recommendations
Reset
NAICS 327993 Mineral Wool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0864 # 05 Y:2013 05 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,999 $27,500 Not Implemented
OK0864 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,158 $10,250 Implemented
OK0864 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,176 $10,642 Implemented
OK0864 # 08 Y:2013 08 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $127,574 $25,000 Not Implemented
OK0864 # 09 Y:2013 09 2013 USE FLUE GAS RECUPERATION TO REDUCE VOC $79,353 $32,100 Implemented
WM0027 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,697 $644 Implemented
WM0027 # 02 Y:2013 02 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,649 $276 Implemented
WM0027 # 03 Y:2013 03 2013 UPGRADE CONTROLS ON COMPRESSORS $8,153 $5,600 Implemented
WM0027 # 04 Y:2013 04 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,126 $1,240 Not Implemented
WM0027 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $191 $400 Not Implemented
WM0027 # 06 Y:2013 06 2013 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $344 $1,545 Not Implemented
WM0027 # 07 Y:2013 07 2013 MODIFY WORKLOAD $53,406 $0 Not Implemented
WM0027 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,010 $7,260 Not Implemented
WM0027 # 09 Y:2013 09 2013 AUTOMATE FINISHING PROCESS $53,406 $11,000 Not Implemented
MS0332 # 01 Y:2008 01 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $771,322 $1,000 Implemented
MS0332 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $358,713 $96,000 Not Implemented
MS0332 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,875 $65,823 Implemented
MS0332 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,591 $401 Implemented
MS0332 # 05 Y:2008 05 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,696 $6,360 Implemented
MS0332 # 06 Y:2008 06 2008 USE OPTIMUM THICKNESS INSULATION $143 $108 Implemented
WV0362 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $80,064 $26,135 Not Implemented
WV0362 # 02 Y:2007 02 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,461 $13,900 Not Implemented
WV0362 # 03 Y:2007 03 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,679 $2,000 Not Implemented
WV0362 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,748 $660 Not Implemented
WV0362 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,397 $0 Implemented