Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 327999 | All Other Miscellaneous Nonmetallic Mineral Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CW0116 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $752 | $70 | Implemented |
CW0116 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $138 | $90 | Implemented |
CW0116 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $46 | $0 | Implemented |
CW0116 # 07 Y:2020 | 07 | 2020 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $438 | $0 | Implemented |
SF0544 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $920 | $0 | Implemented |
SF0544 # 02 Y:2019 | 02 | 2019 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $1,610 | $2,208 | Implemented |
SF0544 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,820 | $9,188 | Implemented |
SF0544 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $249,622 | $1,187,556 | Implemented |
SD0519 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,572 | $1,500 | Implemented |
SD0519 # 05 Y:2015 | 05 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $3,856 | $210 | Implemented |
SD0519 # 04 Y:2015 | 04 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,983 | $16,500 | Implemented |
SD0519 # 02 Y:2015 | 02 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $15,251 | $10,325 | Implemented |
SD0519 # 01 Y:2015 | 01 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $15,876 | $6,475 | Implemented |
MA0714 # 02 Y:2013 | 02 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,831 | $5,568 | Implemented |
MA0714 # 08 Y:2013 | 08 | 2013 | TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS | $1,360 | $150 | Implemented |
MA0714 # 07 Y:2013 | 07 | 2013 | OPTIMIZE PLANT POWER FACTOR | $11,188 | $13,500 | Implemented |
MA0714 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,362 | $13,800 | Implemented |
MA0714 # 01 Y:2013 | 01 | 2013 | BURN A LESS EXPENSIVE GRADE OF FUEL | $64,988 | $67,000 | Implemented |
UK1311 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,500 | $5,600 | Implemented |
UK1311 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,537 | $1,340 | Implemented |
UK1311 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,278 | $27,331 | Implemented |
UK1311 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,665 | $200 | Implemented |
UK1311 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,284 | $88,771 | Implemented |
UD0869 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,808 | $1,000 | Implemented |
UD0869 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $753 | $825 | Implemented |